Gabreski Airport Lease Screening Committee
Revised Summary of May 20, 2005, Meeting
[This memo, prepared by the airport's business manager, summarizes the Lease
Screening Committee meeting of May 20, 2005. Appended to it are copies of nine resolutions granting preliminary
approval for various projects at the airport; seven of these cover hangar construction and establishment of new
"fixed base operations." The most significant part of the document (highlighted in red) is a proposal
to amend these resolutions to exempt all the projects from environmental
review!]
Suffolk County Department of Economic Development & Workforce Housing
Aviation Division - Francis S. Gabreski Airport
Westhampton Beach, NY 11978
Phone 631-852-8095 o Fax 631-852-8092
To: Airport Lease Screening Committee Members
From: Neil Toomb
Date: 08/24/05
Subject: Revised Summary of 05/20/O5 meeting
The following is a revised summary of the items from the last meeting.
If there are any questions I can be reached at 852-8115.
ADMINISTRATIVE ITEMS:
ELECTION OF VICE CHAIR
The committee voted on electing a Vice Chair for 2005.
Committee Action
Motion by Brian Herrington to nominate Carolyn Fahey.
Second by B.J. McCartan.
Motion approved 7-0-0-1. (Absent Tom DeMayo).
UPDATE: SCPD MEDIVAC PLANS
Ken Phaelan from DPW and Tony Ceglio updated the committee regarding the site plan for the Suffolk County Police
Department Medivac hangar.
CONSIDERATION OF MINUTES 03/16/05
Committee Actions
Motion by Carolyn Fahey to accept minutes with the errata sheet.
Second by Fran Siems.
Motion approved 7-0-U-I (Absent Toni DeMayo)
TABLED ITEMS:
I.G.N. INVESTMENT GROUP (G&L PAVING)
Committee Actions
Motion by Brian Herrington to table subject to call.
Second by Carolyn Fahey.
Motion approved 7-0-0-1 (absent Tom DeMayo).
Discussion
Decision by committee to carry all tabled subject to call items on future agendas.
EXCELAIRE
ExcelAire submitted a revised application to lease 5-10 acres for the construction of a full service FBO that will
include a fuel farm. The project is to be completed in two phases. Phase I will consist of the 20,000 gallon fuel
farm, and a building consisting of 5200 SF of Office space and 24,960 SF of Hangar space with a parking area for
54 cars. Phase II to consist of another building consisting of 5200 SF of Office space and 24,960 SF of Hangar
space with a parking area for 54 cars.
Committee Actions
Motion by Carolyn Fahey to approve non-site specific for 5 acres, for the construction of a fixed base operation,
substantially conforming to the preliminary site plan, which includes a 20,000 gallon fuel farm, a building consisting
of 5200 SF of Office space and 24,960 SF of Hangar space with a parking area for 54 cars, at an appraisal rate
set by the Division of Real Estate, at a location to be determined in the future by the Department of Economic
Development and Workforce Housing with a 60 day right of first refusal for an additional 5 acres, subject to site
plan approval by Airport Manager, DPW for code review, Health Department etc. with stipulation that facility cannot
tie into the airport utility grid and be required to provide their own connections to infrastructure when available.
Second by Fran Siems.
Motion approved 7-0-0-I (absent Tom DeMayo).
Next Steps
Upon completion of the Airport Lease Parcel Layout Plan, ExcelAire will finalize location with the Airport Manager.
ExcelAire will then need to file Form 7460 (notice of proposed construction) with the FAA. ExcelAire will need
to be on agenda for next meeting so to rescind the approval for technical correction and committee will need to
make a SEQRA determination or refer to CEQ.
NEW APPLICATIONS
TACTRONICS, INC.
Tactronics is a privately held, Department of Defense small business headquartered on County Road 31 in Westhampton
Beach. They also have facilities in Fayetteville, NC and Tennessee. They are expanding and are requesting approval
to lease 5 acres on the south side of the airport property for the construction of a hangar and aviation related
maintenance facility.
Committee Actions
Motion by Legislator Schneiderman regarding SEQRA determination that the proposed project is an unlisted action
with a negative declaration for the following reasons:
1. The proposed action will not exceed any of the criteria in Section 617.7 (c) (1) of Title 6 NYCRR that sets
forth thresholds for determining significant adverse impacts on the environment.
2. The proposal does not appear to significantly threaten any unique or highly valuable environmental or cultural
resources as identified in or regulated by the Environmental Conservation Law of the State of New York or the Suffolk
County Charter or Code and;
3. The site does not appear to suffer from any severe environmental development constraints (no poor soil properties,
no high groundwater and no unmanageable slopes);
4. The project is in conformance with the Central Pine Barrens Joint Planning and Policy Commission Standards and
Guidelines for Development within the Compatible Growth Area of the Central Pine Barrens.
5. The proposal is in conformance wit the Airport Master plan.
Second by Kevin LaValle.
Motion approved 7-0-0-1 (absent Tom DeMayo).
Motion by Brian Herrington to approve a lease for 5 acres on south side of airport, at an appraisal rate set by
the Division of Real Estate, subject to Airport Management Site Review, DPW for code review, Health Department
etc. with stipulation that facility cannot tie into the airport utility grid and be required to provide their o~
connections to infrastructure when available.
Second by Pat Zielinski.
Motion approved 7-0-0-1 (absent Tom DeMayo).
Next Steps
Tactronics will need to complete survey and site plan and file Form 7460 (notice of proposed construction) with
the FAA. Lease to be drafted by County Attorney's Office.
HAMPTON JITNEY
Hampton Jitney is a current tenant in good standing at the airport. Since
they are located within the planned industrial park area, they requested approval to lease 3 acres on the south
side of the airport for relocation of their parking and waiting area.
Committee Actions
Motion by Legislator Schneiderman regarding SEQRA determination tat the proposed project is an unlisted action
with a negative declaration forte following reasons:
1. The proposed action will not exceed any of the criteria in Section 617.7 (c)
(1) of Title 6 NYCRR that sets forth thresholds for determining significant adverse impacts on the environment.
2. The proposal does not appear to significantly threaten any unique or highly valuable environmental or cultural
resources as identified in or regulated by the Environmental Conservation Law of the State of New York or the Suffolk
County Charter or Code and;
3. The site does not appear to suffer from any severe environmental development constraints (no poor soil properties,
no high groundwater and no unmanageable slopes);
4. The project is in conformance with the Central Pine Barrens Joint Planning and Policy Commission Standards and
Guidelines for Development within the Compatible Growth Area of the Central Pine Barrens.
5. The proposal is in conformance with the Airport Master plan.
Second by Fran Siems.
Motion approved 7-0-0-I (absent Torn DeMayo).
Motion by Legislator Schneiderman to approve a lease for 3 acres on south side of airport, at an appraisal rate
set by the Division of Real Estate, subject to DPW for code review, Health Department etc. with stipulation that
facility cannot tie into the airport utility grid and be required to provide their own connections to infrastructure
when available.
Second by Carolyn Fahey.
Motion approved 7-0-0-1 (absent Tom DeMayo).
Next Steps
Hampton Jitney will need to complete survey and site plan and file Form 7460 (notice of proposed construction)
with the FAA. Lease to be drafted by County Attorney's Office.
HOLY MOSES CHEESECAKE
Holy Moses is current tenant of good standing at the airport. Since their current building is located within the
planned industrial park area, they requested approval to lease a 1500 Sq. Ft. building off of Route 104 with 8,095
Sq. Ft. of property.
Committee Actions
Motion by Legislator Schneiderman regarding SEQRA determination that the proposed project is an unlisted action
with a negative declaration for the following reasons:
1. The proposed action will not exceed any of the criteria in Section 617.7 (c) (1) of Title 6 NYCRR that sets
forth thresholds for determining significant adverse impacts on the environment.
2. The proposal does not appear to significantly threaten any unique or highly valuable environmental or cultural
resources as identified in or regulated by the Environmental Conservation Law of the State of New York or the Suffolk
County Charter or Code and;
3. The site does not appear to suffer from any severe environmental development constraints (no poor soil properties,
no high groundwater and no unmanageable slopes);
4. The project is in conformance with the Central Pine Barrens Joint Planning and Policy Commission Standards and
Guidelines for Development within the Compatible Growth Area of the Central Pine Barrens.
5. The proposal is in conformance with the Airport Master plan.
Second by Carolyn Fahey.
Motion approved 7-0-0-1 (absent Tom DeMayo).
Motion by Carolyn Fahey to approve a lease for 1500 Sq. ft. building off of Route 104 with 8,950 Sq. Ft. of property,
at an appraisal rate set by the Division of Real Estate, subject to DPW for code review, Health Department etc.
with stipulation tat facility cannot tie into the airport utility grid and be required to provide their own connections
to infrastructure when available. Further that all signage be submitted to the Town of Southampton for approval.
Second by Pat Zielinski.
Motion approved 7-0-0-1 (absent Tom DeMayo).
Next Steps
Holy Moses will need to complete survey and site plan and file Form 7460 (notice of proposed construction) with
the FAA if alteration is proposed to site. Lease to be drafted by County Attorney's Office.
DBA Transportation
DBA is current tenant of good standing at the airport. They lease .25 acres of paved area for parking of 5 buses
that they use to transport for AHRC employees. Since they are currently located within the planned industrial park
area, they requested approval to lease a parking area behind the Sheriffs building for parking their 5 buses.
Committee Actions
Motion by Legislator Schneiderman regarding SEQRA determination that the proposed project is a Type II action with
no SEQRA determination necessary for the following reasons:
1. Since the lease will be for existing paved property with no construction or land
development, no further environmental review is necessary.
Second by Kevin LaValle.
Motion approved 7-0-0-1 (absent Torn DeMayo).
Motion by Legislator Schneiderman to approve a lease a non site specific parking area to accommodate 5 buses, at
an appraisal rate set by the Division of Real Estate, in an area of the airport as determined by Airport Management.
Second by Fran Siems. Motion approved 7-0-0-I (absent Tom DeMayo).
Next Steps
Site to be determined by Airport Management, agreement to be drafted by County
Attorney's Office.
NEW RESOLUTIONS REQUIRED RELATING TO
PAST APPROVALS:
• Mailand - ALSC Resolution
010-2002
• Sea Empty - ALSC
Resolution 017-2003
• Brookwood - ALSC
Resolution 018-2003
• Northside Hangars - ALSC Resolution 007-2004
• AMPCO - ALSC Resolution 016-2004
• Eastway - ALSC Resolution 017-2004
• ExcelAire - ALSC Resolution 003-2005
• Tactronics - ALSC Resolution 004-2005
• Holey Moses - ALSC Resolution 006-2005
REQUIRED CLAUSES:
WHEREAS,
the Airport Lease Screening Committee via resolution number XXXIX dated XX/XX'XXXX previously approved the leasing
of XXXXIX to XXXXX Inc for construction of XXXIX, now be it hereby
RESOLVED: that
this Airport Lease Screening Committee, being the lead agency under S.E.Q.R.A. pursuant to Suffolk County Charter
C15-4 (U), hereby finds and determines that this resolution constitutes an unlisted action with a negative declaration,
pursuant to Title 6 of the New York Code of Rules and Regulations ("NYCRR") §617.2 (ak) and that
implementation of this action will not have a significant impact on the environment for the following reasons:
1. XXXXXXXXXXXXXXXXXXXX
2. XXXXXXXXXXXXXXXXXXXX
RESOLVED
that the term of the lease shall be for XXX years, at an annual rate to be determined from an appraisal by the
County Real Estate Division, subject to the terms and conditions as set forth by the County Attorneys Office, and
be it further,
[The proposed amendment, intended to be inserted into existing resolutions,
ends here.]
• Mailand - ALSC Resolution
010-2002
|
Airport Lease Screening Committee
RES. NO.010-2002
DATE: December 18, 2002
LEASE OF PROPERTY TO RICHARD MAILAND FOR THE CONSTRUCTION OF
HANGARS AT FRANCIS S. GABRESKI AIRPORT
WHEREAS, the Airport Lease Screening Committee
has received and reviewed an application to approve the lease of property to Richard Mailand for construction of
twenty Hangars, now be it hereby
RESOLVED, the Airport Lease Screening
Committee hereby approves a property lease to Richard Mailand for the purpose of constructing a unit of twenty
T-hangars, at a location to be determined in the future by the Department of Economic Development and be it further,
RESOLVED that the lease shah be at
an annual rate to be determined from the most recent appraisal by the County Real Estate Division, subject to the
terms and conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that the construction of
proposed hangars to be completed within one year of the date of lease execution, as drawn on submission, subject
to all utilities and necessary and appropriate infrastructure as required by the lease, and be it fin-titer
RESOLVED: that in the judgment of
the Airport Lease Screening Committee, the above activity is determined to be environmentally safe, economically
beneficial to the County of Suffolk and in the public interest; and be it further;
RESOLVED: that pursuant to Suffolk
County Charter §C15-4, the Airport Lease Screening Committee forwards this lease to the Suffolk County Legislature
and recommends to the Suffolk County Legislature that the proposed lease request be approved.
| Motion by: |
Eric Sachs |
Seconded by: Christine Costigan |
| Committee Vote: |
Appointed: 8 |
Ayes: 6 |
| |
Total Voting: 8 |
Nays: 0 |
| |
|
Abstentions: 2 Leg. Guldi |
B.J. McCartan (designee for Pres. Officer Tonna)
|
• Sea Empty - ALSC
Resolution 017-2003
|
AIRPORT LEASE SCREENING COMMITTEE
RES. NO.017-2003 D
DATE: July 25. 2003
LEASE OF PROPERTY TO SEA EMPTY EQUIPMENT, INC. FOR HANGAR
CONSTRUCTION AT FRANCIS S. GABRESKI AIRPORT
WHEREAS, the Airport Lease Screening Committee
has received and reviewed an application to approve the leasing of property to Sea Empty Equipment Inc. for construction
of hangars, now be it hereby
RESOLVED, the Airport Lease Screening
Committee hereby approves a lease for property at Francis S. Gabreski Airport to Sea Empty Equipment, Inc., for
the purpose of constructing a unit of six T-hangars and a 100 X 100 hangar, at a location to be determined in the
future by the Department of Economic Development and be it further,
RESOLVED: that the construction of
proposed hangars to be completed within one year of the date of lease execution, as drawn on submission, subject
to all utilities and necessary and appropriate infrastructure as required by the review of the Department of Public
Works, and that they be provided from non-airport sources at the tenant's sole cost and expense and provided to
the extent that any existing structures of Sea Empty Equipment that are in any way connected to Airport facilities
be removed there from and connected to the new installed infrastructure
RESOLVED that the lease shall be at
an annual rate to be determined from the most recent appraisal by the County Real Estate Division, subject to the
terms and conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that in the judgment of
the Airport Lease Screening Committee, the above activity is determined to be environmentally safe, economically
beneficial to the County of Suffolk and in the public interest; and he it further;
RESOLVED: that pursuant to Suffolk
County Charter §C15-4, the Airport Lease Screening Committee forwards this lease to the Suffolk County Legislature
and recommends to the Suffolk County Legislature that the proposed lease request be approved.
| Motion by: |
Leg. Guldi |
Seconded by: Christine Costigan |
| Committee Vote: |
Appointed: 8 |
Ayes: 7 |
| |
Total Voting: 8 |
Nays: 1 |
| |
|
Abstentions: 0 |
|
• Brookwood - ALSC
Resolution 018-2003
|
AIRPORT LEASE SCREENING COMMITTEE
RES. No. 018-2003
DATE: July 25, 2003
LEASE OF PROPERTY TO BROOKWOOD, INC. FOR HANGAR CONSTRUCTION AT
FRANCIS S. GABRESKI AIRPORT
WHEREAS. the Airport Lease Screening Committee
has received and reviewed an application to approve the leasing of property to Brookwood Inc., for construction
of hangars, now be it hereby
RESOLVED, the Airport Lease Screening
Committee hereby approves a land lease to Brookwood, Inc., for the purpose of constructing 20 T-hangars, at a location
to be determined in the future by the Department of Economic Development and be it further,
RESOLVED: that the construction of
proposed hangars to be completed within one year of the date of lease execution, as drawn on submission, subject
to all utilities and necessary and appropriate infrastructure as required by the review of the Department of Public
Works, and be it further,
RESOLVED that the lease be at an annual
rate to be determined from the most recent appraisal by the County Real Estate Division, subject to the terms and
conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that in the judgment of
the Airport Lease Screening Committee, the above activity is determined to be environmentally safe, economically
beneficial to the County of Suffolk and in the public interest; and be it further;
RESOLVED: that pursuant to Suffolk
County Charter §C15-4, the Airport Lease Screening Committee forwards this lease to the Suffolk County Legislature
and recommends to the Suffolk County Legislature that the proposed lease request be approved.
| Motion by: |
Eric Sachs |
Seconded by: Tom DeMayo |
| Committee Vote: |
Appointed: 8 |
Ayes: 7 |
| |
Total Voting: 8 |
Nays: 1 |
| |
|
Abstentions: 0 |
|
• Northside
Hangars - ALSC Resolution 007-2004
|
AIRPORT LEASE SCREENING COMMITTEE
RES. No.007-2004
DATE: April 2, 2004
LEASE FOR PROPERTY TO NORTHSIDE HANGARS FOR THE CONSTRUCTION OF
HANGARS AT FRANCIS S. GABRESKI AIRPORT
WHEREAS, the Airport Lease Screening Committee
has received and reviewed an application to approve the leasing of property at Francis S. Gabreski Airport to Northside
Hangars, Inc., for the construction of T-hangars, now be it hereby
RESOLVED, the Airport Lease Screening
Committee hereby approves a land lease to Northside Hangars for the purpose of constructing a unit of twenty T-hangars,
at a location to be determined in the future by the Department of Economic Development and be it further,
RESOLVED: that the construction of
proposed hangars to be completed within one year of the date of lease execution, as drawn on submission, subject
to all utilities and necessary and appropriate infrastructure as required lease and subject to review and. approval
by the Department of Public Works, and be it further
RESOLVED that the lease shall he at
an annual rate tote determined from the most recent appraisal by the County Real Estate Division, subject to the
terms and conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that in the judgment of
the Airport Lease Screening Committee, the above activity is determined tote environmentally safe, economically
beneficial to the County of Suffolk and in the public interest; and be it further;
RESOLVED: that pursuant to Suffolk
County Charter §C15-4 (D), the County Executive & Presiding Officer or their designee be and they hereby
are authorized to execute, seal and acknowledge the License Agreement for the above described use and on the above
described conditions between Northside Hangars, Inc. and the County of Suffolk, and upon such other terms and conditions
as may be approved by the County Executive
| Motion by: |
Thomas DeMayo |
Seconded by: Patricia Zielinski |
| Committee Vote: |
Appointed: 8 |
Ayes: 8 |
| |
Total Voting: 8 |
Nays: 0 |
|
• AMPCO - ALSC Resolution
016-2004
|
AIRPORT LEASE SCREENING COMMITTEE
RES. NO. 016-2004
DATE: November 12, 2004
PROPERTY LEASE AT FRANCIS S. GABRESKI AIRPORT TO AMPCO II LLC. OF 5 ACRES
FOR CONSTRUCTION OF CORPORATE HANGAR
WHEREAS. the Airport Lease Screening Committee
has received and reviewed an application submitted by Ampco II LLC., requesting to lease property at Francis S.
Gabreski Airport for the purposes of constructing a corporate hangar, and
WHEREAS, Suffolk County Code §C15-4(D)
requires that any action by the Airport Lease Screening Committee which is not approved by the unanimous vote of
the entire membership of said Committee be submitted for consideration by the Suffolk County Legislature, and
WHEREAS, in the absence of the unanimous
vote of the entire membership of the Committee the Airport Lease Screening Committee must refer the application
to the County Legislature for its consideration; now, therefore, be it
RESOLVED, that the Airport Lease Screening
Committee hereby approves the leasing of acres of property to Ampco II LLC. for the purpose of constructing a 130X
130 SF. corporate hangar, and be it further,
RESOLVED, that the term of the lease
shall be for twenty years at an annual rate as determined from the most recent appraisal by the County Real Estate
Division, with an option to renew for twenty years, subject to the terms and conditions as set forth by the County
Attorneys Office, subject to approval by the FAA, and be it further,
RESOLVED, the approval is subject
to agreement between Ampco II LLC. and the Department of Economic Development with regards to site location to
be determined upon completion of the revised Airport Layout Plan, and be it further;
RESOLVED, that the site and construction
plans be subject to approval by the Department of Public Works and the Department of Health, and that the site
plan be submitted for review to the Council of Environmental Quality, and be it further,
RESOLVED, that upon plan approval
by the Department of Public Works and the Department of Health, and upon obtaining a negative declaration by CEQ,
the Airport Lease Screening Committee asks that the County Attorney prepare a lease and pursuant to Suffolk County
Charter §Cl5-4, the Airport Lease Screening Committee forwards this application to the Suffolk County Legislature
and recommends to the Suffolk County Legislature that the proposed lease request be approved.
| Motion by: |
Carolyn Fahey |
Seconded by: Legislator Jay Schneiderman |
| |
Approved: 5-0-0-3 |
Ayes: 5 |
| Committee Vote: |
Total Voting: 5 |
Nays: 000000000000000000000Abstentions: 0 |
| |
Absent: 3 |
(Fran Siems representing Presiding Officer Joseph Caricappa, Thomas DeMayo representing
the public at large, Legislator Paul Tonna, Chairman, Suffolk County Health Committee) |
|
• Eastway - ALSC Resolution
017-2004
|
AIRPORT LEASE SCREENING COMMITTEE
RES. NO. 017-2004
DATE: November 12, 2004
PROPERTY LEASE AT FRANCIS S. GABRESKI AIRPORT TO EASTWAY AVIATION
OF 4 ACRES FOR A FIXED BASE OPERATION
WHEREAS, The Airport Lease Screening Committee
has received and reviewed an application by Eastway Aviation requesting approval to lease 4 acres of property at
Francis S. Gabreski Airport for construction of a 30,000 SF Hangar, an adjacent 6,000 SF office and passenger terminal
building, 300,000 SF of ramp space and a 20,000-gallon fuel farm, and
WHEREAS, Suffolk County Code §C15-4(D)
requires that any action by the Airport Lease Screening Committee which is not approved by the unanimous vote of
the entire membership of said Committee be submitted for consideration by the Suffolk County Legislature, and
WHEREAS, in the absence of the unanimous
vote of the entire membership of the Committee the Airport Lease Screening Committee must refer the application
to the County Legislature for its consideration; now, therefore, be it
RESOLVED, that the Airport Lease Screening
Committee hereby approves the leasing of 4 acres of property to Eastway Aviation for the purpose of constructing
a 30,000 SF Hangar, an adjacent 6,000 SF office and passenger terminal building, 300,000 SF of ramp space and a 20,000-gallon fuel farm, and be it further,
RESOLVED, that the lease shall be
at an annual rate as determined from the most recent appraisal by the County Real Estate Division, subject to the
terms and conditions as set forth by the County Attorneys Office, subject to approval by the FAA, and be it further,
RESOLVED, the approval is subject
to agreement between Eastway Aviation and the Department of Economic Development with regards to site location
to be determined upon completion of the revised Airport Layout Plan, and be it further;
RESOLVED, that the site and construction
plans be subject to approval by the Department of Public Works and the Department of Health, and that the site
plan be submitted for review to the Council of Environmental Quality, and be it further,
RESOLVED, that upon plan approval
by the Department of Public Works and the Department of Health, and upon obtaining a negative declaration by CEQ,
the Airport Lease Screening Committee asks that the County Attorney prepare a lease and pursuant to Suffolk County
Charter §Cl5-4, the Airport Lease Screening Committee forwards this application to the Suffolk County Legislature
and recommends to the Suffolk County Legislature that the proposed lease request be approved.
| Motion by: |
Carolyn Fahey |
Seconded by: Brian Herrington |
| |
Approved: 5-0-0-3 |
|
| Committee Vote: |
Appointed: 8 |
Total Voting: 5 |
| |
Ayes: 5 |
Nays: 000000000000000000000Abstentions: 0 |
| |
Absent: 3 |
(Fran Siems representing Presiding Officer Joseph Caricappa, Thomas DeMayo representing
the public at large, Legislator Paul Tonna, Chairman, Suffolk County Health Committee) |
|
• ExcelAire - ALSC
Resolution 003-2005
|
AIRPORT LEASE SCREENING COMMITTEE
RES. NO. 003-2005
DATE: May 20, 2005
LEASE FOR PROPERTY TO EXCELAIRE SERVICES, INC. FOR THE CONSTRUCTION
OF
FIXED BASE OPERATION AND FUEL FARM AT FRANCIS S. GABRESKI AIRPORT
WHEREAS, the Airport Lease Screening Committee
has received and reviewed an application, Environmental Assessment Form and preliminary site plan to approve the
leasing of property at Francis S. Gabreski Airport to ExcelAire Services, Inc. for the construction of a fixed
base operation to include a 20,000 gallon fuel farm, a building consisting of 5200 SF of Office space and 24,960
SF of Hangar space with a parking area for 54 cars, now be it hereby,
RESOLVED, the Airport Lease Screening
Committee hereby approves a land lease to ExcelAire Services, Inc. for 5 acres for the construction of a fixed
base operation, substantially conforming to the preliminary site plan, which includes a 20,000 gallon fuel farm,
a building consisting of 5200 SF of Office space and 24,960 SF of Hangar space with a parking area for 54 cars,
at a location to be determined in the future by the Department of Economic Development and Workforce Housing and
be it further,
RESOLVED: that the approval is subject
to there being a SEQRA review of the project once a location is finalized which results in a negative declaration
by the Committee, and be it further,
RESOLVED, that the lease include a
60 day right of first refusal for an additional 5 acres for the construction of another building consisting of
5200 SF of Office space and 24,960 SF of Hangar space with a parking area for 54 cars, subject to site plan approval
by Airport Manager and the Department of Economic Development and Workforce Housing, Suffolk County Department
of Public Works, Suffolk County Health Department, and be it further.
RESOLVED: that the lease be subject
to all utilities and necessary and appropriate infrastructure as required with the tenant required to provide their
own connections to infrastructure when available and that it cannot tie into the airport utility grid, and be it
further
RESOLVED that the lease shall be at
an annual rate to be determined from an appraisal by the County Real Estate Division, subject to the terms and
conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that iii the judgment of
the Airport Lease Screening Committee, the above activity is determined to be economically beneficial to the County
of Suffolk and in the public interest.
| Motion by: |
Carolyn Fahey |
Seconded by: Fran Siems |
| Committee Vote: |
Appointed: 8 |
Ayes: 7 |
| |
Total Voting: 5 |
Nays: 0 |
| |
|
Absent: 1 (Tom DeMayo) |
|
• Tactronics -
ALSC Resolution 004-2005
|
AIRPORT LEASE SCREENING COMMITTEE
RES. NO. 004-2005
DATE: May 20, 2005
LEASE FOR PROPERTY TO TACTRONICS, INC. FOR THE CONSTRUCTION OF HANGAR
AT FRANCIS S. GABRESKI AIRPORT
WHEREAS, the Airport Lease Screening Committee
has received and reviewed an application and Environmental Assessment Form to approve the leasing of 5 acres of
property at Francis S. Gabreski Airport to Tactronics, Inc. for the construction of a 20,000 SF aircraft hangar
and aviation related maintenance facility, now be it hereby
RESOLVED, the Airport Lease Screening
Committee hereby approves a land lease of 5 acres to Tactronics, Inc. for the purpose of constructing a 20,000
SF aircraft hangar and aviation related maintenance facility, and be it further,
RESOLVED, that the lease be subject
to site plan approval by the Airport Manager and the Department of Economic Development and Workforce Housing,
Suffolk County Department of Public Works, Suffolk County Health Department, and be it further,
RESOLVED: that the lease be subject
to all utilities and necessary and appropriate infrastructure as required with the tenant required to provide their
own connections to infrastructure when available and that it cannot tie into the airport utility grid, and he it
further
RESOLVED that the lease shall be at
an annual rate to be determined from an appraisal by the County Real Estate Division, subject to the terms and
conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that in the judgment of
the Airport Lease Screening Committee, the above activity is determined to be economically beneficial to the County
of Suffolk and in the public interest; and be it further;
RESOLVED: that this Airport Lease
Screening Committee, being the lead agency under S.E.Q.R.A. pursuant to Suffolk County Charter C15-4 (I)), hereby
finds and determines that this resolution constitutes an unlisted action with a negative declaration, pursuant
to Title 6 of the New York Code of Rules and Regulations ("NYCRR") §617.2 (ak) and that implementation
of this action will not have a significant impact on the environment for the following reasons:
1. The proposed action will not exceed any of the criteria in Section 617.7 (c)
(I) of Title 6 NYCRR that sets forth thresholds for determining significant adverse impacts on the environment.
2. The proposal does not appear to significantly threaten any unique or highly valuable environmental or cultural
resources as identified in or regulated by the Environmental Conservation Law of the State of New York or the Suffolk
County Charter or Code and;
3. The site does not appear to suffer from any severe environmental development constraints (no poor soil properties,
no high groundwater and no unmanageable slopes);
4. The project is in conformance with the Central Pine Barrens Joint Planning and Policy Commission Standards and
Guidelines for Development within the Compatible Growth Area of the Central Pine Barrens.
5. The proposal is in conformance with the Airport Master plan.
RESOLVED: that pursuant to Suffolk County
Charter C15-4 (D), the County Executive & Presiding Officer or their designee be and they hereby are authorized
to execute, seal and acknowledge the Lease Agreement on the above described use and on the above described conditions
between Tactronics, The, and the County of Suffolk, and upon such other terms and conditions as may be approved
by the County Executive
| Motion by: |
Brian Herrington |
Seconded by: Pat Zielinski |
| Committee Vote: |
Appointed: 8 |
Ayes: 7 |
| |
Total Voting: 7 |
Nays: 0 |
| |
|
Abstentions: 1 (Tom DeMayo) |
|
• Holey Moses
- ALSC Resolution 006-2005
|
AIRPORT LEASE SCREENING COMMITTEE
RES. NO. 006-2005
DATE: May 20, 2005
LEASE FOR 1500 SF BUILDING AND PROPERTY TO HOLEY MOSES CHEESECAKE,
INC.
AT FRANCIS S. GABRESKI AIRPORT
WHEREAS, the Airport Lease Screening Committee
has received and reviewed an application and Environmental Assessment Form to approve the leasing of a 1500 SF
building and 8,950 SF of property off of Route 104 at Francis S. Gabreski Airport to Holey Moses Cheesecake Inc.
for the relocation of their cheesecake manufacturing facility, now be it hereby
RESOLVED, the Airport Lease Screening
Committee hereby approves a lease for the 1500 SF building and 8,950 SF of property to Holey Moses Cheesecake,
Inc. for the relocation of their cheesecake manufacturing facility, and be it further,
RESOLVED. that the lease be subject
to site plan approval by the Airport Manager and the Department of Economic Development and Workforce Housing,
Suffolk County Department of Public Works, Suffolk County Health Department, and be it further,
RESOLVED: that the lease be subject
to all utilities mid necessary and appropriate infrastructure as required with the tenant required to provide their
own connections to infrastructure when available and that it cannot tie into the airport utility grid, and be it
further
RESOLVED: that the lease he subject
to tenant obtaining approval by The Suffolk County Department of Economic Development and Workforce Housing and
the Town of Southampton as required for any signage on die building and/or property, and be it further
RESOLVED that the term of the lease
tenant be for three years, at an annual rate to be determined from an appraisal by the County Real Estate Division,
subject to the terms and conditions as set forth by the County Attorneys Office, and be it further,
RESOLVED: that in the judgment of
the Airport Lease Screening Committee the above activity is determined tote economically beneficial to the County
of Suffolk and in the public Interest; and be it further;
RESOLVED: that this Airport Lease
Screening Committee, being the lead agency under S.E.Q.R.A. pursuant to Suffolk County Charter C15-4 (I)), hereby
finds and determines that this resolution constitutes an unlisted action with a negative declaration, pursuant
to Title 6 of the New York Code of Rules and Regulations ("NYCRR") §617.2 (ak) and that implementation
of this action will not have a significant impact on the environment for the following reasons:
1. The proposed action will not exceed any of the criteria in Section 617.7 (c)
(I) of Title 6 NYCRR that sets forth thresholds for determining significant adverse impacts on the environment.
2. The proposal does not appear to significantly threaten any unique or highly valuable environmental or cultural
resources as identified in or regulated by the Environmental Conservation Law of the State of New York or the Suffolk
County Charter or Code and;
3. The site does not appear to suffer from any severe environmental development constraints (no poor soil properties,
no high groundwater and no unmanageable slopes);
4. The project is in conformance with the Central Pine Barrens Joint Planning and Policy Commission Standards and
Guidelines for Development within the Compatible Growth Area of the Central Pine Barrens.
5. The proposal is in conformance with the Airport Master plan.
RESOLVED: that pursuant to Suffolk County
Charter Cl 5-4 (D), the County Executive & Presiding Officer or their designee be and they hereby are authorized
to execute, seal and acknowledge the Lease Agreement on the above described use and on the above described conditions
between Tactronics, The, and the County of Suffolk, and upon such other terms and conditions as may be approved
by the County Executive
| Motion by: |
Carolyn Fahey |
Seconded by: Patricia Zielinski |
| Committee Vote: |
Appointed: 8 |
Ayes: 7 |
| |
Total Voting: 7 |
Nays: 0 |
| |
|
Absent: 1 (Tom DeMayo) |
|
|